
As a homeowner or contractor, it is essential to ensure that the subfloor of any room is adequately prepared before laying the final flooring material. Cement board is a great option for flooring because it is durable, moisture-resistant, and can withstand heavy loads. If you are wondering how to install cement board on the floor, this step-by-step guide will help you through the entire process.
Introduction

Cement board is a thin layer of concrete reinforced with fiberglass mesh that is placed between the subfloor and the final flooring material. Installing cement board on the floor provides a stable and level surface for the final flooring material, prevents moisture damage, and protects the subfloor from heavy loads. Cement board is commonly used in areas like the bathroom, laundry room, and kitchen, where moisture and heavy loads are expected.
Before starting the installation process, it is essential to gather all the materials and tools needed for the job.
Gather Materials and Tools
The first step is to gather all the materials and tools needed for the installation process. Here is a list of the essential items required:
Materials Needed:
- Cement board
- Thin-set mortar
- Screws
- Mesh tape
- Waterproofing sealant
Tools Needed:
- Circular saw or jigsaw
- Measuring tape
- Utility knife
- Drill
- Trowel
- Sandpaper
- Safety glasses
- Dust mask
It is important to ensure that all the materials used are of high quality to guarantee the durability and longevity of the final flooring material. You can purchase these materials from your local hardware store or home improvement center. Additionally, be sure to wear safety glasses and a dust mask while cutting the cement board to prevent inhalation of harmful dust particles.
Prepare the Floor
Before installing the cement board, it is crucial to prepare the floor surface. Here are the steps to follow:
Clean the floor surface
Clean the floor surface to remove any dirt, debris, or adhesive residue. You can use a vacuum cleaner or a broom to sweep the surface. Ensure that the floor is completely free of dust and debris.
Check for levelness
Check the levelness of the floor using a level. If there are any high or low spots, you will need to address them before installing the cement board. High spots can be sanded down, while low spots can be filled in with a leveling compound.
Address any cracks or holes
Address any cracks or holes in the floor surface. If there are any significant cracks or holes, they should be filled in with a patching compound. Allow the compound to dry completely before moving to the next step.
Cut and Install Cement Board
After preparing the floor surface, it is time to cut and install the cement board. Here are the steps to follow:
Measure and mark the cement board
Measure the area where the cement board will be installed and mark it on the cement board using a pencil and a straight edge. Be sure to leave a 1/4-inch gap between the cement board and the wall to allow for expansion.
Cut the cement board to size
Cut the cement board to size using a circular saw or jigsaw. Ensure that the edges are straight and smooth. You can use a utility knife to score the cement board before cutting it with a saw to reduce dust.
Apply thin-set mortar to the floor
Apply a layer of thin-set mortar to the floor using a trowel. Ensure that the layer is even and covers the entire area where the cement board will be installed.
Lay the cement board in place
Lay the cement board in place on top of the thin-set mortar. Ensure that it is centered and aligned with the markings on the floor.
Secure the cement board with screws
Secure the cement board to the floor using screws. The screws should be placed every 8 inches along the edges and every 12 inches in the center. Be sure to countersink the screws slightly below the surface of the cement board.
Fill and Tape Joints
After the cement board has been installed on the floor, the next step is to fill and tape the joints. This process involves covering the seams between the cement boards with mesh tape and filling them with thin-set mortar. Here are the steps to follow:
- Apply a layer of thin-set mortar over the seam using a trowel.
- Place the mesh tape over the seam and press it firmly into the mortar.
- Apply another layer of thin-set mortar over the mesh tape, making sure to cover the entire tape.
- Use the flat side of the trowel to smooth out the surface, making sure that the mortar is level with the cement board.
- Allow the mortar to dry completely before moving on to the next step.
Finish the Floor
Once the thin-set mortar has dried, the next step is to finish the floor. Here are the steps to follow:
- Sand down any rough spots or high areas using sandpaper. Make sure the surface is smooth and level.
- Apply a waterproofing sealant over the entire surface of the cement board. This will help prevent moisture from seeping through and damaging the subfloor.
- Allow the sealant to dry completely before moving on to the next step.
- Finally, install the final flooring material over the cement board. Make sure to follow the manufacturer’s instructions for installation, and use the appropriate adhesive or fasteners.
By following these steps, you can successfully install cement board on the floor and create a stable and durable surface for your final flooring material. Remember to take your time and ensure that each step is done correctly to guarantee the longevity and durability of your flooring.